RKVY Project Call Intimation
Dept. of Agriculture, Govt. of Karnataka has invited Detailed Project Reports (DPR’s)/ proposals under RKVY-RAFTAAR for the year 2027-28.
The DPR’s should be prepared as per the prescribed format and RKVY-RAFTAAR guidelines (copy enclosed). There is no provision for engaging manpower (SRF/RA/Tech. Assistant…etc.,) on contractual basis including Traveling Allowance(TA), vehicle purchase/ POL .. etc. for project work under RKVY. These things should not be included while proposing the budget in the DPR.
The hard copy of the DPR should be prepared with the following specified alignment and MS word format .
- Font style: Times New Roman
- Font size: 12
- Line spacing: Single
- Paragraph spacing – 12 pt (Before & after)
The hard copy – 2 copies of DPR’s prepared lore through proper channel on or before 19th November 2026 positively. The soft copy of the DPR, if needed, will be requested.
Dr. T.S. Manjunatha Swamy


